Content updated October 16, 2026. Sources and review scope appear below. The worksheets use the shared calculation method.

ICON A5 ownership costs: an amphibious ownership and calendar budget

The useful operating cost for a ICON A5 is the cost of the aircraft and mission you intend to operate. Start with its records, a dated maintenance forecast and written provider quotations. This guide supplies a quote checklist and calculation method; it does not state a current market price, fuel burn, insurance premium or overhaul bill.

An amphibious ownership and calendar budget

  • Which A5 configuration, propeller installation and applicable POH or maintenance-manual edition match the serial number, and are the latest relevant safety publications reflected in the records?
  • What calendar and operating-time work does an ICON-capable provider identify for the engine, airframe, parachute and other applicable components, with a written scope?
  • Do water-use insurance, transition training, storage or approved trailering arrangements, cleaning and the intended maintenance-provider access appear separately in the quotation?

Use ICON: A5 service providers and current technical publications to locate the relevant documentation or support route. Confirm applicability and revision status with the provider. Publication access is not evidence of a current service price or a completed review of this aircraft.

Keep four cost groups separate

  • Fixed: annual insurance, hangar, subscriptions, training and applicable scheduled charges, using actual scope and billing periods.
  • Direct: fuel, oil, routine maintenance and mission expenses that change with usage. Match flight-hour, block-hour or cycle units before combining them.
  • Reserves: planned funding for identified future events. Separate each engine, propeller or other component as applicable; remove costs already covered by a paid program.
  • Debt: scheduled financing cash payments and any maturity balance, shown outside operating expense. Tax, depreciation, acquisition work and resale assumptions need separate treatment.

The AOPA cost-estimating method separates usage costs and reserves. For a self-funded event, divide the quoted unfunded amount by verified remaining usage; if a calendar deadline comes first, plan cash by that date. Historical example dollars are not current ICON A5 quotations.

Test the decision before buying

Model the actual storage and water-use arrangement. A hangared land operation and an amphibious seasonal plan can require different services; use provider quotations and the applicable publications instead of copying an advertised ownership example.

Replace every worksheet default with your own dated assumptions; defaults are illustrative, not ICON A5 specifications or quotes. Reconcile annual cash and per-hour totals before sharing a plan. Use the ownership planner and calculation methods to inspect the assumptions and exclusions.

Put your own quotes into the worksheet

These inputs are educational planning assumptions. Cost and tax rates start at zero so they cannot be mistaken for researched aircraft costs or an exemption. Enter the aircraft records, written quotes and transaction-specific tax treatment you verified. A zero result before entering those amounts is not a cost estimate.

Operating-cost worksheet

Cost inputs start at zero. Enter written fuel, hangar, insurance, maintenance and overhaul quotes. Annual hours and remaining engine hours are editable planning assumptions. A zero total before entering costs is not an ownership estimate.

Sources and review scope

Content updated . Sources support the specific rules or methods identified below; they do not establish a market valuation, lender approval or a quote for this aircraft.